City
Bonney Lake, WA
Pulled with Bonney Lake Fire every month since 2019. Reynolds knows our submittals on sight; you don't have to translate.
Local amendments that aren't in the base IFC. Memorized from 14 pulls with this AHJ in the last 12 months — every line costs a re-inspection if you miss it.
| Topic | What this AHJ wants | Reference |
|---|---|---|
| Knox-box | Required on all new commercial and any existing system flagged after 2024. | BLFD Adm. Order 24-02 |
| FDC connection | 5″ Storz with locking cap on new installs; older NST grandfathered until next service. | NFPA 13 § 8.17 |
| Hydrant flow test | Test must be ≤ 12 months at submittal. BLFD will witness on 3 days' notice. | NFPA 291 · BLFD policy |
| Re-inspection | Reynolds works AM appointments. Accepts contractor commitment letter as a stay on the original deadline. | BLFD policy · informal |
| Date | Tag | Scope | AHJ | NFPA / Ref |
|---|---|---|---|---|
| 2025·11 | MULTIFAMILY | 12-unit, 3-story apartment install | Bonney Lake FD | NFPA 13R |
| 2025·05 | RESIDENTIAL | Lake-house addition · 13D extension | Bonney Lake FD | NFPA 13D |
New construction, additions, multifamily, and commercial systems.
Leaks, damaged components, and inspection-driven corrections.
Head relocations and system updates for remodels and buildouts.
Bonney Lake proper. We also pull in adjacent Pierce County cities — see service-area index.
FAQ